Modarsyss™ · Home and garage platform

A whole wall of use. Not one hole.

Floor-standing uprights carry shelves, cabinets, a desk, a worktop and power, in the garage, home office, kitchen or living room. The floor carries the load, nothing is drilled, and it all comes down tool-free when the household moves.

Floor-borne: no drilling, no ceiling pressure
Modarsyss garage wall: floor-standing uprights carrying shelving, cabinets, a workbench and garden tools
Modarsyss a living room wall: floor-standing uprights carrying bookshelves, a televisiona nd a media unit
180 kgper upright, cantilevered
FOS 2.9safety factor
0tools to assemble

180 kg per upright, carried as cantilevered shelves at 300 mm (12 in) projection, safety factor 2.9. Frame-supported configurations, such as a bench or unit on its own legs, are rated separately.

Can it help your customers?
  1. No drilling, no damage.

    For walls that can't or shouldn't be drilled: rented flats, concrete walls, finished rooms. The upright carries the load to the floor.

  2. More than shelving.

    The same uprights carry a desk, a worktop, cabinets and hanging space, so one system furnishes the whole wall.

  3. Power where it's used.

    Power is available at the point of use, for a lamp, a charger or a bench tool. Charging follows the charger maker's instructions.

  4. It moves when they move.

    It comes down tool-free and goes up again in the next home, garage or room.

Can it help you?
  1. A platform, not a product.

    A range for the garage and every room in the home, built around the customers you already serve.

  2. Protected internationally.

    Patent pending, with an international (PCT) application filed.

  3. No channel conflict.

    We license only. We never make or sell.

Engineering

FEA-analysed in the wall-side configuration shown. Independently reviewed by a Chartered Engineer (CEng MIMechE), Resonant Engineering Ltd, and confirmed consistent with accepted practice.

Next step

Scoped structural evaluation

A fixed fee and a defined scope. Your engineers judge it on the numbers. The fee is credited against the upfront licence fee if a licence is signed within 90 days of the report.

Request the evaluation scope →
  • FEA report
  • Calculation package
  • Chartered Engineer review
  • Envelope drawings
  • Written Q&A

Write directly.

Every enquiry is answered personally, in writing.

[email protected]

Ang International Inc. · Toronto · Licensing only · Patent pending · PCT/CA2026/051245